China’s water and its economy do not sit in the same places. Nearly 70 percent of its city clusters, more than 90 percent of its energy bases, and over 60 percent of its main grain-producing areas lie in water-scarce regions. Beijing’s response has been to move water, and with it the conditions for growth, from south to north. The national water network, or water grid, is more than an engineering programme: it redistributes resources, investment, and development across regions.
Planned since 2021, the grid was incorporated into a wider investment framework in 2026. At the “Two Sessions” in March, Zheng Shanjie, director of the National Development and Reform Commission (NDRC), unveiled the “six networks” (六张网): water, power, computing, communications, urban underground pipelines, and logistics. He estimated that investment in these and other priority areas would exceed ¥7 trillion in 2026. On April 28, the Political Bureau of the Communist Party of China (CPC) Central Committee elevated the framework to a headline priority, listing water first. Wu Qiang, director of the Ministry of Water Resources’ (MWR) Development Research Center, forecasts more than ¥6 trillion in water-grid investment demand over the 15th Five-Year Plan (2026–30). Yet unlike power grids or computing networks, much of this infrastructure cannot generate sufficient revenue to cover its costs.
This raises three questions: who pays, who benefits, and what changes? Financing comes primarily from central-government bonds, policy banks, local special bonds, and state-owned enterprises (SOEs), while local governments and utilities shoulder much of the delivery and operating costs. Source regions bear ecological obligations and the social costs of transfers, while households and farmers pay tariffs constrained by affordability. Benefits accrue to receiving regions, which gain reliable supplies for cities, energy bases, and agriculture; central SOEs building the network; and Beijing, which gains an avenue for sustaining investment as private and property investment weaken. The institutional balance is also shifting: water-allocation decisions are moving towards the centre, while local governments increasingly compete for centrally supported projects and bond quotas rather than relying on independent borrowing.
This article argues that China is financing its water grid primarily as a state-building and public-goods project rather than a commercial one. Its success depends on reconciling national water security with local fiscal capacity, regional interests, and affordability.
The Water Grid: From Canals to a Network
China’s water challenge is less about overall scarcity than uneven distribution. It supports nearly 20 percent of the world’s population with just 6 percent of its freshwater. The MWR describes the country’s conditions as summer floods, winter shortages, a dry north, and a wet south. Areas north of the Yangtze basin account for 64 percent of China’s land, 46 percent of its population, and 60 percent of its farmland, but only 19 percent of its water. Agriculture consumes 62 percent of national water use, while irrigated land, covering about 56 percent of farmland, produced 80.76 percent of China’s grain in 2025.
Managing this imbalance has long been an exercise in statecraft. Xi Jinping has said that, in a certain sense, governing water is governing the country. In October 1952, Mao Zedong observed that the south had abundant water while the north had little, suggesting that borrowing some would be acceptable. Rooted in the Mao-era conviction that “man must conquer nature” (人定胜天), this thinking informed the South-to-North Water Transfer Project (SNWTP). Its 2002 master plan envisaged three routes carrying 44.8 billion cubic metres annually: 14.8 billion on the eastern route, 13 billion on the middle route, and 17 billion on the western route. The eastern route opened in 2013, followed by the middle route in 2014.
The results have been substantial. Groundwater levels on the North China Plain have risen by about 0.7 metres annually since 2020, southern water supplies account for nearly 80 percent of central Beijing’s water, and by August 2026 the middle route had transferred more than 80 billion cubic metres, benefiting nearly 118 million people. However, the gains come with unevenly distributed costs. Raising the Danjiangkou Reservoir, the middle route’s principal source, required the relocation of approximately 345,000 people. Source regions must meet conservation obligations and accept development constraints, while receiving regions gain water for households, industry, and urban expansion. Transfers thus redistribute not only water but also the opportunities and obligations attached to it.
At a symposium in Nanyang in May 2021, Xi outlined four principles: “water saving first, spatial balance, systematic governance, and two hands working together” (两手发力), referring to the roles of the state and market. The 2023 Outline for National Water Network Construction positions natural rivers and lakes as the foundation, transfer works as the channels, and storage works as the nodes. Officials describe the design as “four horizontals and three verticals” (四横三纵): the Yangtze, Huai, Yellow, and Hai rivers run east to west, linked north to south by the three SNWTP routes. Writing in Qiushi (求是), the CPC’s leading theory journal, Water Resources Minister Li Guoying describes a system connecting national, provincial, city, and county networks, extending to the “last mile” of villages and irrigation districts.
Only two of the three north-south routes are operational. The Yangtze-to-Han diversion will increase the middle route’s average annual transfer from 9.5 billion to 11.51 billion cubic metres, while the western route across the Qinghai-Tibet Plateau remains in planning, although the China South-to-North Water Diversion Group has pledged to start construction as soon as possible. The next phase will deepen central coordination. Network coverage stands at 80.3 percent of China’s territory, with the government targeting 82 percent by 2030, alongside 15 billion cubic metres of additional reservoir storage and 98 percent rural tap-water coverage. Particularly consequential is the planned national dispatch centre, supported by basin-level sub-centres. Real-time allocation across interconnected basins would give Beijing greater influence over water distribution during droughts and floods.
What the Six Networks Change
The six-networks framework elevates water’s political and economic importance while changing its access to finance.
First, it makes water infrastructure part of the national stimulus agenda. Infrastructure investment fell 2.2 percent in 2025, its first annual decline in the National Bureau of Statistics (NBS) series since 2014, with economists citing tight local finances and a shortage of quality projects. The slowdown continued in January–October 2026, when fixed-asset investment fell 8.1 percent, infrastructure investment 5.1 percent, and private investment 11.4 percent. Water projects offer an avenue for sustaining investment and employment: water conservancy investment reached ¥1.28 trillion in 2025 and generated 3.15 million jobs. Climate shocks strengthen the case. In 2023, the Hai River basin experienced its heaviest rainfall since 1963, causing ¥95.811 billion in direct losses in Hebei. In July 2025, the Huai River commission launched a drought emergency response after rainfall fell 82 percent below normal.
Second, the framework elevates water from a ministry-level programme to a whole-of-government priority. On September 28, 2026, a State Council executive meeting called for the early commencement of six-networks projects and ageing-reservoir renovations. The following day, the People’s Bank of China (PBoC) cut its pledged supplementary lending (PSL) rate, which provides low-cost funding to policy banks, from 1.75 to 1.5 percent and extended the facility to all six networks.
However, water must compete for funding with networks offering higher commercial returns. In January–October 2026, investment in water conservancy management fell 16.7 percent, while investment in information transmission rose 32.0 percent. Dagong Global Credit Rating observes that water networks and urban pipelines resemble public utilities: demand is stable, but capital requirements are large, payback periods long, and revenue dependent on user fees and government payments or subsidies. This is reflected in institutional coordination. On August 19, 2026, the NDRC began establishing a “2+3+N” mechanism linking two grid companies, three telecommunications operators, and computing firms. No equivalent has been announced for water, despite its importance to the other networks. Reservoirs support pumped-storage hydropower, while data centres and power plants require cooling water. Flood defences reduce economic losses and irrigation underpins grain production, but individual operators and financiers struggle to capture these wider benefits. This gap between public value and commercial returns lies at the heart of the financing challenge.
Who Pays for the Pipes?
Financing the grid requires Beijing to reconcile investment and water security with its commitment to containing hidden debt, while addressing local fiscal constraints, investors’ demand for returns and households’ need for affordable water.
During the 14th Five-Year Plan (2021–25), China completed ¥5.68 trillion in water conservancy investment. Local special bonds, bank loans and “social capital” contributed ¥2.05 trillion, or 36.1 percent, of which social capital accounted for ¥548.5 billion. However, “social capital” (社会资本) also includes SOEs. Under the narrower definition in China’s public-private partnership (PPP) rules, private capital contributed just ¥13.43 billion of ¥312.81 billion raised between January and August 2026, less than 4.3 percent, despite an 80.1 percent year-on-year increase.
Local governments have limited capacity to contribute more as they resolve hidden debt, including off-budget borrowing by local government financing vehicles (LGFVs). In November 2024, Beijing announced a ¥10 trillion debt-swap package to address such liabilities, which stood at ¥14.3 trillion at the end of 2023. Yet repayment competes with new investment. Of the ¥4.4 trillion special-bond quota for 2025, Bloomberg calculated that around ¥3.02 trillion was available for infrastructure, the lowest since 2019, after ¥1.38 trillion went to debt repayment. Special bonds can provide project capital for water infrastructure, and the MWR has urged localities to secure larger allocations. With local borrowing constrained, provinces have greater incentives to compete for centrally supported projects and bond quotas.
Debt rules also shape private-sector participation. The State Council’s 2023 PPP mechanism prohibits local governments from covering project costs through viability-gap subsidies, guaranteed returns, or availability payments. NDRC guidance also states that public-interest projects without operating revenue cannot use concessions. While these rules strengthen fiscal discipline, they leave private investors with limited incentives to finance flood control and other low-revenue infrastructure. In this light, public finance is key to the water grid.
Pricing presents a related tension between financial sustainability and affordability. Under the NDRC’s 2022 rules for centrally administered and inter-provincial projects, government-funded capacity is priced to break even or generate a small profit. A Hohai University study of the eastern route’s Jiaodong branch estimates that incorporating ecological compensation for source regions into water prices would have required increases of ¥0.93 per cubic metre in 2016 and ¥4.51 in 2020. It warns that prices could exceed receiving regions’ affordability unless transfers reach design capacity. Ning Yuan, former deputy director of the State Council’s South-to-North Water Diversion Construction Committee Office, says the eastern route’s water-fee mechanism urgently needs adjustment. Hohai University economists Tian Guiliang and Xia Qing, writing in the MWR journal China Water Resources, similarly advocate institutional reforms to broaden infrastructure financing. Where tariffs cover delivery but not source-region protection, the shortfall must be addressed through fiscal transfers or intergovernmental negotiation.
Centre Builds, Counties Maintain
The financing structure reflects a broader division of responsibilities: the centre sets strategic direction and mobilises long-term capital, while provinces and local governments make projects work on the ground.
Ultra-long special treasury bonds financed 1,465 projects with ¥700 billion in 2024 under the “two major” (两重) programme, which spans multiple sectors, including water. The NDRC’s policy financial instruments, which inject capital to help projects secure additional borrowing, totalled ¥500 billion in 2025 and ¥800 billion in 2026. The Agricultural Development Bank of China (ADBC), a major lender for farmland and water infrastructure, provided ¥315 billion. Yet artificial intelligence and the digital economy were among the 2026 tranche’s headline priorities, illustrating that water must compete even for policy-bank financing.
Central SOEs provide much of the grid’s construction capacity. The State-owned Assets Supervision and Administration Commission (SASAC) says central SOEs plan around ¥2 trillion in six-networks investment in 2026 and are deeply involved in building the network’s 40 backbone channels. The China South-to-North Water Diversion Group is constructing the Yangtze-to-Han diversion, with a static investment of ¥55.158 billion. For these firms, the six networks provide policy-backed projects as property construction weakens; for Beijing, they offer established institutions capable of delivering large-scale infrastructure.
Provinces are also experimenting with ways to make projects more financially viable. In February 2026, Sichuan published a list of 137 water projects requiring ¥60.7 billion in financing, signed 27 financing agreements, and began registering water projects as property assets. Jiangxi is piloting the sale of newly created farmland quotas to finance water works. In Zhejiang, the Tangpu Reservoir real estate investment trust (REIT) raised ¥1.697 billion towards the new Jingling Reservoir, budgeted at ¥12.26 billion. These mechanisms unlock value from water assets and broaden financing options, but cannot replace public funding for infrastructure with limited revenue potential.
Cities and counties are balancing pricing reform with protection for vulnerable users. Taishan, in Guangdong, requires most new construction projects to obtain water through rights trading, while Nanjing and Shenzhen have raised tap-water prices in line with central guidance on cost-based pricing. Agricultural water-price reform covers more than 1 billion mu (about 66.7 million hectares), mainly through metering and subsidies. Where affordability is a greater concern, prices have moved in the opposite direction. In 2025, Hotan city in Xinjiang reduced water prices for grain crops from ¥0.1781 to ¥0.1163 per cubic metre.
Private capital generally participates alongside, rather than independently of, the state. In Yingde, Guangdong, central SOE China Gezhouba established a water company with the city’s state-asset firm and a private equity partnership. Water trading also remains limited. The China Water Exchange recorded a record 1.61 billion cubic metres in 2025, roughly 0.27 percent of national water use of 594.45 billion cubic metres. Trading adds flexibility to administrative allocation but does not replace it.
The division of responsibilities matters particularly once construction ends. By the end of 2025, rural tap-water coverage had reached 96 percent, large-scale projects served 71 percent of the rural population, and 72 percent of counties had adopted unified county-level management. Of the ¥590.28 billion localities secured for rural water supply during the 14th Five-Year Plan, 80 percent came from local bonds, bank loans, social capital, and other sources. The priority is now shifting from expanding access to ensuring reliable operation. A March 2026 circular from six central agencies called for diversified operation and maintenance funding, encouraging private participation while retaining a guiding role for government funds. Yet operating costs are already a challenge in poorer areas. In Chongqing’s mountainous Fengjie county, officials acknowledge that some rural water projects cannot cover their costs, with ageing pipes and unstable water sources adding to the difficulties. Central funding can build these systems, but their long-term reliability depends on local fiscal and operational capacity.
Move the Water or Move the Growth?
The financing model also reflects a strategic choice: move water to growth or move growth towards available water. At Nanyang, Xi described conservation as the “fundamental way out” for receiving regions, urging planners to align urban development, industrial activity, and population distribution with local water capacity.
There has been measurable progress in water efficiency. Total water use remained broadly stable during the 14th Five-Year Plan as the economy expanded. In 2025, water use per ¥10,000 of gross domestic product (GDP) fell 4.5 percent, while water use per ¥10,000 of industrial value added declined 7.2 percent. The 15th Five-Year Plan targets a further 10 percent reduction in both measures. The irrigation water-use efficiency coefficient reached 0.583 in 2025, below the 0.7–0.8 that Chinese researchers estimate for developed countries.
The two approaches distribute costs differently. Transfers place obligations on source regions and the central budget while supporting construction and supply security in receiving areas. Demand management instead places greater pressure on water-intensive industries, cities facing tighter limits, and farmers adapting irrigation practices. Scarcity pricing can encourage efficiency and improve project finances, but full cost recovery is difficult where affordability and food security take precedence, as Xinjiang’s lower agricultural tariffs illustrate. Moreover, expanding network coverage does not guarantee water security. Seasonal mismatches, pumping costs, ecological constraints in source basins, and weak local distribution systems can limit the benefits of additional infrastructure. In this context, China’s 2030 targets should be assessed not only by infrastructure built, but also by supply reliability, water quality, affordability, and maintenance capacity.
Conclusion
China’s national water network is an exercise in state capacity. The six-networks framework gives water a broader economic mandate, while central bonds, policy banks, and SOEs finance infrastructure whose public benefits often exceed its commercial returns. The gains are substantial: expanded supplies, improved rural access, and greater capacity to redistribute water between basins.
The challenge is distributing the costs and responsibilities of sustaining these gains. Beijing increasingly coordinates water allocation, while provinces and counties maintain the infrastructure and source regions shoulder obligations that receiving regions do not. Three developments will indicate how these tensions are managed: whether Beijing approves the western route or prioritises conservation; whether water receives a dedicated coordination mechanism comparable to those for more commercial networks; and whether pricing reform extends to transferred water and source-region compensation. The question is not simply how much China can invest, but who bears the cost of sustaining what it builds.